Login
Menu
About Us
Accreditation
Strength
Accomplishment
Promoters
Awards
Certificates
Services
Structural Strengthening
Bridge Lifting And Replacement of Bearing
Structural Evolution By NDT Testing
Bidge Load Test And Rating of Bridge
Structural Modification And Extention
Consultancy
Rehabilitation
PileTesting
Clientele
Projects
Case Studies
Career
Contact Us
Inquiry
+91-0265-2323226
info@shivamconcrete.com
Our CaseStudy
Tapi old bridge
Reason of damages
Due to deep water in Tapi river and pier at height of 50 to go ft above water level,
it was not possible to make scaffold from ground level (GL) which is 20 ft below
water level
Therefore inspection of bridge damages and diagnosis was not possible and it was
neglected for a long time and was open for traffic which detoriated the bridge very
badly
Back
SPEAK TO US TODAY ABOUT HOW WE CAN WORK TOGETHER
Get in touch