OUR SERVICES PileTesting 1
Normally conventional method (Kentledge method i.e. concrete block and platform) is used. However this method is very inconvenient, cumbersome, costly and time consuming.
So modern, faster and economical method e.g. rock anchoring, anchor pile & Dynamic (Pile analyzer: needs to be adopted. These methods require very less space as compare to Kentledge method.
Rock anchor save almost 40% cost and 60 to 70% time as compare to kentledge method. Similarly Dynamic pile load save almost 70% of cost and 80 to 90% of time as compare to kentledge method.
We have adopted these both methods (i.e. Rock anchor and Dynamic Pile load) for one of our client and they were very happy with them as it saved them cost and time.
Projects Completed :
Dynamic Pile Testing
Arrangement for Dynamic Pile Test
Hammer arrangement forDynamic Pile Test
Rock Anchor Method
Arrangement of Rock Anchor Method
Cable for Rock Anchoring